Senior staff are implementing the Cultural Resources Monitoring and Treatment Plan for the construction of a 160-megawatt alternating current (AC) solar photovoltaic energy generating facility with up to 160 MW of battery storage. The power produced by the Project would travel from a switchyard located within the Project Area and interconnect with the Western Area Power Administration’s (WAPA) Headgate Rock-Blythe 161-kV transmission line. Procedures are followed for previously discovered archaeological resources that cannot be avoided through mitigation and to reduce potential impacts to undiscovered buried archaeological resources associated with the proposed Project.