The project is proposed by SCE to address the local capacity deficiency in the Moorpark subarea and involves stringing a 230-kV circuit approximately 26 miles on existing structures, installing terminal equipment at substations, and relocating existing circuit terminations in the 230 kV switchrack at Moorpark Substation.
PanGIS GIS specialists used ArcGIS to map and analyze environmental resources along the circuit.