Scope of Work:
Under the terms of the 2009 System-wide Programmatic Agreement (SWPA) for management of historic properties affected by operations of the Federal Columbia River Power System (FCRPS), the United States Army Corps of Engineers (USACE) Portland District and the Bonneville Power Administration (BPA) requested cultural resources research and studies to address outdated data resulting from additional surveys that identified new sites within the project boundary. PanGIS’s Principal Investigator led a team of qualified staff to identify discrepancies between the Corps’ site data and records maintained in the Oregon Archaeological Records Remote Access (OARRA) and the Washington Information System for Architectural and Archaeological Records Data (WISAARD), summarize John Day site information in tabular format, apply Jenevein (2014) monitoring criteria to archaeological sites, and compile the results in a technical report.
Projects / Federal